This is what you see after uploading a cost sheet: every line read, the arithmetic checked, and an Instant Briefing on whether the price holds up.
Sample — a fictional cost sheet in our standard format; the same engine as your account.
9 material lines, read from the cells of the file — nothing estimated.
| Item | Supplier | Unit price | Cons. | Amount |
|---|---|---|---|---|
| FABRIC BODY900D RECYCLED POLY, PU COATED | DYNATEX | 2.85 | 1.10 yd | $3.14 |
| FABRIC LINING210D POLYESTER | DYNATEX | 1.45 | 0.90 yd | $1.31 |
| WEBBING25MM NYLON | HANG SHENG | 0.32 | 2.50 yd | $0.80 |
| ZIPPERYKK #5 RC | YKK VN | 0.58 | 1.80 pc | $1.04 |
| ZIPPER PULLERMETAL, CUSTOM LOGO | YKK VN | 0.12 | 4.00 pc | $0.48 |
| BUCKLEDURAFLEX 25MM | DURAFLEX | 0.21 | 2.00 pc | $0.42 |
| FOAMEVA 5MM BACK PANEL | VINA FOAM | 0.65 | 0.55 yd | $0.36 |
| LABEL SETWOVEN LABEL + HANGTAG | LABEL HOUSE | 0.18 | 1.00 set | $0.18 |
| PACKINGPOLYBAG + CARTON SHARE | LOCAL | 0.6085 | 1.00 set | $0.61 |
Cost build-up (USD per unit)
Material
$8.33
61% of FOB
CMT
$2.73
20% of FOB
Overhead
$1.09
8% of FOB
Margin
$1.50
11% of FOB
Arithmetic checked by code — every line, the totals and the FOB add up.
Question: Is this priced fairly?
What to do
How this was judged
Not shown in the sample — they need your account, and the sample does not imitate their output.
Deep Dive
Line-by-line gaps and what to ask the factory for.
Ask
Any question about this sheet, your plans and your history.
Negotiation brief
An opening position for the next round.
Walk-away FOB
Add your retail price and margin floor to see the most you can pay.